setout.Contact
Templates pack / GCC-FIDIC-PACK
GCC-FIDIC-PACKGCC 2015 · FIDIC Red · FIDIC YellowWaitlist

GCC 2015 + FIDIC Pack.

For infrastructure work where the contract is the project.

Editable starters for SAICE GCC 2015 and FIDIC Red and Yellow — claim notices aligned to the clause references that decide whether a claim is alive or dead. Drafted for water, sanitation, energy and roads projects in South Africa.

What's in the pack

Contents

GCC 2015 starters

  • ·Contract Data and Pricing Data templates with employer-side defaults.
  • ·Scope of Work drafting checklist for civils, water and sanitation packages.
  • ·Engineer's Determination template, structured as Clause 10.5 requires.
  • ·Programme submission and revision templates aligned to Clause 5.6.

FIDIC starters

  • ·FIDIC Red Book Particular Conditions starter (1999 / 2017 mapping table).
  • ·FIDIC Yellow Book Particular Conditions starter (1999 / 2017 mapping table).
  • ·Engineer's Instruction, Notice of Claim and Determination letter set.

Claims

  • ·Notice of Claim templates citing the time bar in each clause.
  • ·Particulars of Claim template with cause-effect-quantum structure.
  • ·Worked example: a delay claim from notice to determination, on a real water-treatment-plant fact pattern.

Closeout

  • ·Taking-Over Certificate and Performance Certificate templates.
  • ·Final Statement and Discharge templates.
  • ·Defects Notification Period tracking workbook.

Sample

An excerpt the team can read in 30 seconds.

Every pack has worked examples drafted to the same standard we use on retainer. The point isn't volume; it's that every notice cites its clause and every quotation separates the things the contract asks you to separate.

Sample — Notice of Claim (FIDIC Yellow 1999)Sub-Clause 20.1
Pursuant to Sub-Clause 20.1, the Contractor gives notice that an event occurred on 22 January 2026 that may give the Contractor an entitlement to an extension of the Time for Completion under Sub-Clause 8.4 and to additional Cost under Sub-Clause 4.12. This notice is given within 28 days of the Contractor becoming aware of the event. Particulars and a fully detailed claim will follow within the time required by Sub-Clause 20.1.

FAQ

Things people ask.

GCC 2015 only, or earlier editions too?
GCC 2015 only. Earlier editions are out of currency for new work; we'll cover GCC 2010 on request as a paid adaptation.
FIDIC 1999 or 2017?
Both. Each Particular Conditions starter ships with a 1999↔2017 mapping table so a team migrating between editions can see what changed and where.
Are the worked examples redacted real projects?
No. They are constructed fact patterns, drafted from scratch, that mirror common South African infrastructure scenarios. No real party is identifiable.
Editable, or locked PDFs?
Editable .docx and .xlsx. No DRM, no per-seat licence.

Waitlist

Tell us you want this pack.

We'll email you once when this pack ships, with launch pricing — no newsletter, no drip campaign. One email, then silence unless you write back.

Need the contract drafted for a specific live project before then? See project-specific adaptation.

One email at launch. No newsletter.