HIRA risk assessment generator

Build a hazard identification and risk assessment register. Free · exports as .txt.

List each activity and its hazards, rate the risk before and after controls, and assign responsibility. Click the common construction hazards to add them with typical control measures already filled in.

Common construction hazards — click to add
ActivityHazardBeforeControl MeasuresAfterResponsible
Risk assessment
Free · downloads as .txt

Questions

What is a HIRA?
HIRA stands for Hazard Identification and Risk Assessment. It's a structured register that lists each activity, the hazards it presents, the risk rating before controls, the control measures, the residual risk after controls, and who is responsible. It's a required element of a construction health-and-safety plan.
Is a risk assessment required on a construction site?
Yes. Under the Construction Regulations 2014, a contractor must carry out a risk assessment for the construction work and put control measures in place. A documented HIRA is how that's evidenced, and it's commonly a returnable document in tenders.
How do I rate risk before and after controls?
Rate the inherent risk of the hazard first (Low to Critical), then apply your control measures and rate the residual risk. Good controls should visibly reduce the rating — that reduction is the point of the assessment. This generator lets you set both ratings per line.

Aligned to the OHS Act (Act 85 of 1993) and Construction Regulations 2014. Export as plain text and format it in your company template. Need a method statement too? Use the method statement generator.